Sirene Belek

Sirene Belek

Structure class Hotel & Resort
Location Belek, Antalya

Project Scale

38 Villas
2 Bars (Beach and Pool Bar)

Borda Yapı carried out the 38 villas, the beach bar, the room renovations, and the pool bar at Sirene Belek Hotel. All works except furniture and MEP were delivered by Borda Yapı.

Project detail

ENGINEERING CHALLENGE

01 / OPERATIONAL CONTINUITY

In an actively operating tourism facility, the greatest risk is that renovation or new-build work disrupts the guest experience or the property's operating calendar.

We integrated our site operations into the facility's own rhythm, delivering site management that preserved business continuity with zero risk.

02 / CONCURRENT SITE MANAGEMENT

The core challenge on this project was carrying out new villa construction alongside the renovation of existing structures (such as the Pool Bar) simultaneously, without closing the facility.

Heavy construction work, fine finishing trades, and electromechanical revisions were phased so as not to interfere with one another. Interventions to the facility's infrastructure were carried out with almost surgical precision and targeted, localized planning, so as never to interrupt the operation of existing systems.

Engineering challenge context

ENGINEERING BEHIND THE ARCHITECTURE

Behind what is visible lies an invisible network of engineering that breathes life into the structure.

Engineering infrastructure Finished architecture
TOUCH TO REVEAL ENGINEERING

The villa structures and renovation packages were delivered and brought into operation to the targeted quality criteria, in full alignment with the hotel's 5-star operational standards.

BORDA YAPI · MAIN CONTRACTOR

FREQUENTLY ASKED QUESTIONS

01

What was Borda Yapı's role on the Sirene Belek project?

Borda Yapı undertook the 38 villas, the beach bar, the room renovations, and the pool bar, delivering all works except furniture and MEP.

02

Where is Sirene Belek located?

Sirene Belek Hotel is located in Belek, one of Antalya's leading tourism destinations.

03

What was the scope of the Sirene Belek project?

The scope comprised 38 villas, the beach bar, the room renovations, and the pool bar. Furniture and MEP works were outside the scope.

04

How was hotel operation affected during the project?

Site operations were integrated into the facility's operating rhythm; new villa construction and the renovation of existing structures (such as the Pool Bar) were carried out simultaneously without the hotel closing.

05

What was the main challenge during the project's execution?

The most critical engineering challenge was phasing heavy construction work alongside fine finishing trades and electromechanical revisions through targeted, localized planning, without interrupting the facility's existing systems.

Discuss a Similar Project

Contact our team to discuss how we can bring our engineering expertise to your project.